2017-04-06 Preliminary information (french only)
2017-04-06 Map #1
2017-04-06 Map #2
2019-09-26 Barry Volume 1 main report (french only)
2019-09-26 Barry Volume 2 annex (french only)
2020-01-21 Geochemical characterization (french only)
2020-11-02 Answer QC01 (french only)
2021-03-17 Annex 1 restoration plan (french only)
2021-03-17 Annex 2 Environmental study phase 1 (french only)
2021-03-17 Annex 3 Inventory report of reptiles, amphibians and mammal (french only)
2021-03-17 Annex 4 Inventory report of vegetation global study (french only)
2021-03-17 Annex 5 Inventory report of vegetation in mine effluent zone (french only)
2021-03-17 Annex 6 Project file for wetland compensation (french only)
2021-03-17 Annex 7 Management plan for dust (french only)
2021-03-17 Annex 8 GHG statement (french only)
2021-03-17 Annex 9 Preliminary monitoring program revised (french only)
2021-03-17 Annex 10 Synthesis map of sensitives elements (french only)
2021-03-17 Annex 11 Hydrological modelling and contaminant transport (french only)
2021-03-17 Annex 12 Air emissions modelling (french only)
2021-03-17 Main report ENV0266-1512-00
2019-09-26 Barry impact study overview (french only)
2020-04-30 Barry and Moroy mine (french only)
2017-07-15 Barry directive (french only)